Cold Water Storage Tank Replacement Program - Local Authority
3C worked closely with the client contract manager to deliver the replacement of approximately 60 cold water storage tanks within a four month period (design to completion).
3C were responsible for the design of the new tank room layouts, programming of works and notification of disruption to services to all tenants.
- Tank replacement program undertaken over a 3 year period.
- Multiple sites, with works on each site being packaged and tendered as a separate project.
- Tender success rate of >90%.
- Works included the ‘spark free’ cutting up and removal of existing steel tanks.
- The installation of new lighting, access platforms, hooped safety Ladders and fall protection barriers to enable the safe inspection of the new installations.
- Working closely with tank manufacturers we ensured the correct capacity and design of tank was chosen.
- A range of sectional or one-piece Pre-insulated GRP tanks were utilised depending on access limitations and system requirements.
- Approximate Value of works over 3 year period - £300,000.